A 2,000SF shell space was taken and turned it into a pretzel factory with type A2 kitchen, dining, and new toilet rooms. The project included a new HVAC unit, kitchen hood exhaust, hot water heater and LED light fixtures. Sanitary drainage, venting and domestic water to new fixtures as well as new electrical system with utility metering was also include in the project.