A 2,000F space was taken and turned it into a bagel shop with type A2 kitchen, dining, and new toilet rooms. The project included a new HVAC unit, kitchen hood exhaust, hot water heater, and LED light fixtures. Sanitary drainage, venting and domestic water to new fixtures, as well as a new electrical system with utility metering was also included in the project.